home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V11_2 / V11_262.TXT < prev    next >
Internet Message Format  |  1991-07-08  |  6KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/0a:0wfS00VcJ84Rk4Q>;
  5.           Sun, 15 Apr 90 02:05:32 -0400 (EDT)
  6. Message-ID: <Ia-0wFS00VcJA4Q05Q@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Sun, 15 Apr 90 02:05:08 -0400 (EDT)
  11. Subject: SPACE Digest V11 #262
  12.  
  13. SPACE Digest                                     Volume 11 : Issue 262
  14.  
  15. Today's Topics:
  16.          NASA Headline News for 04/12/90 (Forwarded)
  17.            Payload Status for 04/12/90 (Forwarded)
  18. ----------------------------------------------------------------------
  19.  
  20. Date: 13 Apr 90 01:08:49 GMT
  21. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  22. Subject: NASA Headline News for 04/12/90 (Forwarded)
  23.  
  24. -----------------------------------------------------------------
  25. Thursday, April 12, 1990              Audio Service: 202/755-1788
  26. -----------------------------------------------------------------
  27.  
  28. This is NASA Headline News For Thursday, April 12.....
  29.  
  30. Kennedy Space Center ground crews last night removed the 
  31. auxiliary power unit controller for return to the manufacturer.  
  32. However, test results have cleared the computer of any problem.  
  33. It appears a pulse control valve opening in an auxiliary power 
  34. unit did not fully close--allowing extra hydrazine to flow into 
  35. the turbine causing an overspeed condition.  During the 
  36. countdown, the preset launch criteria sensed the condition.  The 
  37. computerized system performed automatically as it should and held 
  38. the count.
  39.  
  40. The STS-31 launch date will be determined once it is clear 
  41. exactly what work is required.  Estimates continue to be 
  42. approximately ten to fourteen days.  Announcement of a target 
  43. date will be discussed later today.
  44.  
  45. As engineers have identified the circuitry in the 15-pound 
  46. controller is not the problem, the mission management teams 
  47. scheduled removal of the APU for necessary work to be completed 
  48. by this weekend.  A hot-firing test is planned for next week.  
  49. Consideration will be given to recharge the Hubble Space 
  50. Telescope batteries while remaining in the payload bay.  
  51.  
  52. The payload bay doors are closed but will be opened later this 
  53. afternoon to install detectors to monitor any possible 
  54. contaminants during turnaround activities.  And, for protection 
  55. against the weather as well as access to the payload bay, the 
  56. rotating service structure remains alongside the Discovery.  
  57.  
  58. Propellants have been drained from the external tanks as well as 
  59. cryogenics from the fuel cells.  And, the five-member crew has 
  60. returned to Johnson Space Center to conduct practice runs in the 
  61. shuttle simulator.
  62.  
  63.                        *        *        *
  64.  
  65. The Human Performance Research Lab at the Ames Research Center is 
  66. expected to be up and running by January 1992.  It will be the 
  67. first research facility designed to study the human role in 
  68. advanced aviation and prolonged space travel.  During yesterday's 
  69. groundbreaking ceremonies, Center Director Dale Compton said it 
  70. will help scientists answer questions and meet space goals like a 
  71. lunar outpost, a Mars expedition or the National Aero-Space 
  72. Plane.  
  73.  
  74.                            ***********
  75.  
  76.  
  77.  
  78.  
  79.  
  80.  
  81.  
  82. -----------------------------------------------------------------
  83. Here's the broadcast schedule for Public Affairs events on NASA 
  84. Select TV.  All times are Eastern.
  85.  
  86.  
  87. Thursday, April 12......
  88.  
  89.           11:30 A.M.         NASA Update will be transmitted.
  90.  
  91.  
  92.  
  93.  
  94.  
  95.  
  96.  
  97.  
  98.  
  99.  
  100. All events and times are subject to change without notice.
  101. -----------------------------------------------------------------
  102. These reports are filed daily, Monday through Friday, at 12 Noon,
  103. EDT.
  104. -----------------------------------------------------------------
  105. A service of the Internal Communications Branch, NASA HQ.
  106.  
  107. ------------------------------
  108.  
  109. Date: 13 Apr 90 01:19:14 GMT
  110. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  111. Subject: Payload Status for 04/12/90 (Forwarded)
  112.  
  113.  
  114.     Daily Status/KSC Payload Management and Operations 04-12-90.
  115.     
  116.     
  117.     - STS-31R HST (at pad-B) -
  118.     
  119.     No activities were performed on Wednesday.  Today the
  120.     payload bay doors will be reopened and preps for restarting
  121.     HST battery charging will be active.
  122.     
  123.     
  124.     - STS-35 ASTRO-1 (at OPF) -
  125.     
  126.     Payload preps for orbiter rollover to the VAB were completed
  127.     Wednesday and the payload bay doors were closed third shift
  128.     today.  Also today, the LAIR demonstration test will be
  129.     performed at Pad-A and BBXRT GSE will be installed and
  130.     checked out in the MLP.
  131.     
  132.     
  133.     - STS-40 SLS-1 (at O&C) -
  134.     
  135.     Rack and floor installation into the module, fire
  136.     suppression system troubleshooting and preps for experiment
  137.     train interface test were active Wednesday and will continue
  138.     today.
  139.     
  140.     
  141.     - STS-42 IML-1 (at O&C) -
  142.     
  143.     On Wednesday module pyrell foam replacement along with racks
  144.     3, 7, and 11 staging operations were performed.  Pyrell foam
  145.     replacement will continue today along with racks 3, 4, 7,
  146.     and 9 staging.
  147.     
  148.     
  149.     - STS-45 (Atlas-1)-
  150.     
  151.     Pallet to pallet mating will continue today.  Forward and
  152.     aft hardpoint installation will also be performed today.
  153.     
  154.     
  155.     - STS-55 SL-D2 (at O&C) -
  156.     
  157.     Rack 12 staging activities will continue today.
  158.     
  159.     
  160.     - HST M&R (at O&C) -
  161.     
  162.     ORUC power network verification will continue today.
  163.  
  164. ------------------------------
  165.  
  166. End of SPACE Digest V11 #262
  167. *******************
  168.